Sunday, October 13, 2013

Week of September 23 - Wells and stairs

The basement stairs were put in and temporary stairs to the second floor were, too.  It's fun to be able to wander around the house now without needing a ladder. 

Both the water and geo-thermal wells were drilled this week.  You wouldn't believe the noise.  They'll be back in a few weeks to make their connections to the house. 

Friday evening was party-time.  We BBQ'd for the Hagedorn Construction crew to thank them for the great job they're doing.  Since it was Chris' sister Sue's birthday as well as Camille's husband Sean we expanded the guest list to include family and friends.  Greg did a great job with the pork steaks and chicken.  After the sun went down, we started a bonfire and watched the stars come out.  Lawn chairs, cold beer and barbeque . . .  what building a house is all about. . .

Framing is almost done for the bedroom.

Basement steps (duh).


Water well.  The white stuff is lime as a result of the drilling process.


Geo-thermal drilling rig.

A nice shot of the exposed beam in the living room.